Infrastructure Development

DISTRICT LEVEL PLANNING AND PARTICIPATORY MANAGEMENT, PROJECT MANAGMENT CONSULTANCY AND QUALITY ASSURANCE

Technical and Vocational Training under Sarva Shiksha Abhiyan
Client Ministry of Human Resource Department EDCIL
Cost INR 10,000 Million
Financed By Government of India
Status 2009-2014
Description The Government of India has initiated the work of Providing “Technical and Vocational Training” at the school level to impact skills to the children of the Country. The work involves imparting Computer Skills, Handicraft activities, Home science and Food Preservation techniques.

Backward Regions Grant Fund (BRGF) Scheme of Korba, Chattisgarh
Client Ministry of Panchayati Raj Government of India
Cost INR 1800 million
Financed By Government of India
Status 2012-ongoing
Description BRGF is a flagship scheme of the Government of India where the identified backward Districts are provided special funds for development to bring them to a desired level. For this goal, the Government of India has proposed the preparation of a Five year Integrated Development Plan for the District wherein all the activities related to Infrastructure, Health, Schooling, Livelihood, Agriculture, Public Health need to be identified through micro level planning and executed for the development of the District. The work involves interaction at the grass root level to identify the gaps in the District using the SWOT analysis to prepare a development plan accordingly.

Backward Regions Grant Fund (BRGF) Scheme of Raigarh, Chattisgarh
Client Ministry of Panchayati Raj Government of India
Cost INR 1500 million
Financed By Government of India
Status 2012-ongoing
Description

BRGF is a flagship scheme of the Government of India where the identified backward Districts are provided special funds for development to bring them to a desired level.  For this goal, the Government of India has proposed the preparation of a Five year Integrated Development Plan for the District wherein all the activities related to Infrastructure, Health, Schooling, Livelihood, Agriculture, Public Health need to be identified through micro level planning and executed for the development of the District.  The work involves interaction at the grass root level to identify the gaps in the District using the SWOT analysis to prepare a development plan accordingly.

Backward Regions Grant Fund (BRGF) Scheme of Bokaro, Jharkhand
Client Ministry of Panchayati Raj Government of India
Cost INR 2000 million
Financed By Government of India
Status 2012-ongoing
Description

BRGF is a flagship scheme of the Government of India where the identified backward Districts are provided special funds for development to bring them to a desired level.  For this goal, the Government of India has proposed the preparation of a Five year Integrated Development Plan for the District wherein all the activities related to Infrastructure, Health, Schooling, Livelihood, Agriculture, Public Health need to be identified through micro level planning and executed for the development of the District.  The work involves interaction at the grass root level to identify the gaps in the District using the SWOT analysis to prepare a development plan accordingly.

Backward Regions Grant Fund (BRGF) Scheme of Chatra, Jharkhand
Client Ministry of Panchayati Raj Government of India
Cost INR 2300million
Financed By Government of India;
Status 2012- ongoing
Description

BRGF is a flagship scheme of the Government of India where the identified backward Districts are provided special funds for development to bring them to a desired level.  For this goal, the Government of India has proposed the preparation of a Five year Integrated Development Plan for the District wherein all the activities related to Infrastructure, Health, Schooling, Livelihood, Agriculture, Public Health need to be identified through micro level planning and executed for the development of the District.  The work involves interaction at the grass root level to identify the gaps in the District using the SWOT analysis to prepare a development plan accordingly.

Backward Regions Grant Fund (BRGF) Scheme of Deoghar, Jharkhand
Client Ministry of Panchayati Raj Government of India
Cost INR 2500million
Financed By Government of India
Status 2012- ongoing
Description

BRGF is a flagship scheme of the Government of India where the identified backward Districts are provided special funds for development to bring them to a desired level.  For this goal, the Government of India has proposed the preparation of a Five year Integrated Development Plan for the District wherein all the activities related to Infrastructure, Health, Schooling, Livelihood, Agriculture, Public Health need to be identified through micro level planning and executed for the development of the District.  The work involves interaction at the grass root level to identify the gaps in the District using the SWOT analysis to prepare a development plan accordingly.

Backward Regions Grant Fund (BRGF) Scheme of Dhanbad, Jharkhand
Client Ministry of Panchayati Raj Government of India
Cost INR 3000million
Financed By Government of India
Status 2012- ongoing
Description

BRGF is a flagship scheme of the Government of India where the identified backward Districts are provided special funds for development to bring them to a desired level.  For this goal, the Government of India has proposed the preparation of a Five year Integrated Development Plan for the District wherein all the activities related to Infrastructure, Health, Schooling, Livelihood, Agriculture, Public Health need to be identified through micro level planning and executed for the development of the District.  The work involves interaction at the grass root level to identify the gaps in the District using the SWOT analysis to prepare a development plan accordingly.

Backward Regions Grant Fund (BRGF) Scheme of Garbha, Jharkhand
Client Ministry of Panchayati Raj Government of India
Cost INR 1800million
Financed By Government of India
Status 2012- ongoing
Description

BRGF is a flagship scheme of the Government of India where the identified backward Districts are provided special funds for development to bring them to a desired level.  For this goal, the Government of India has proposed the preparation of a Five year Integrated Development Plan for the District wherein all the activities related to Infrastructure, Health, Schooling, Livelihood, Agriculture, Public Health need to be identified through micro level planning and executed for the development of the District.  The work involves interaction at the grass root level to identify the gaps in the District using the SWOT analysis to prepare a development plan accordingly.

 

Backward Regions Grant Fund (BRGF) Scheme of Giridih, Jharkhand
Client Ministry of Panchayati Raj Government of India
Cost INR 2200million
Financed By Government of India
Status 2012- ongoing
Description

BRGF is a flagship scheme of the Government of India where the identified backward Districts are provided special funds for development to bring them to a desired level.  For this goal, the Government of India has proposed the preparation of a Five year Integrated Development Plan for the District wherein all the activities related to Infrastructure, Health, Schooling, Livelihood, Agriculture, Public Health need to be identified through micro level planning and executed for the development of the District.  The work involves interaction at the grass root level to identify the gaps in the District using the SWOT analysis to prepare a development plan accordingly.

Backward Regions Grant Fund (BRGF) Scheme of Gumla, Jharkhand
Client Ministry of Panchayati Raj Government of India
Cost INR 2300million
Financed By Government of India
Status 2012- ongoing
Description

BRGF is a flagship scheme of the Government of India where the identified backward Districts are provided special funds for development to bring them to a desired level.  For this goal, the Government of India has proposed the preparation of a Five year Integrated Development Plan for the District wherein all the activities related to Infrastructure, Health, Schooling, Livelihood, Agriculture, Public Health need to be identified through micro level planning and executed for the development of the District.  The work involves interaction at the grass root level to identify the gaps in the District using the SWOT analysis to prepare a development plan accordingly.

Backward Regions Grant Fund (BRGF) Scheme of Hazaribagh, Jharkhand
Client Ministry of Panchayati Raj Government of India
Cost INR 3200million
Financed By Government of India
Status 2012- ongoing
Description

BRGF is a flagship scheme of the Government of India where the identified backward Districts are provided special funds for development to bring them to a desired level.  For this goal, the Government of India has proposed the preparation of a Five year Integrated Development Plan for the District wherein all the activities related to Infrastructure, Health, Schooling, Livelihood, Agriculture, Public Health need to be identified through micro level planning and executed for the development of the District.  The work involves interaction at the grass root level to identify the gaps in the District using the SWOT analysis to prepare a development plan accordingly.

Backward Regions Grant Fund (BRGF) Scheme of Ramghar, Jharkhand
Client Ministry of Panchayati Raj Government of India
Cost INR 1600million
Financed By Government of India
Status 2012- ongoing
Description

BRGF is a flagship scheme of the Government of India where the identified backward Districts are provided special funds for development to bring them to a desired level.  For this goal, the Government of India has proposed the preparation of a Five year Integrated Development Plan for the District wherein all the activities related to Infrastructure, Health, Schooling, Livelihood, Agriculture, Public Health need to be identified through micro level planning and executed for the development of the District.  The work involves interaction at the grass root level to identify the gaps in the District using the SWOT analysis to prepare a development plan accordingly.

Evaluation of Civil Works under the Sarva Shiksha Abhiyan Programme (SSA) in the District Gandhinagar Gujarat
Client Sarva Shiksha Abhiyan Gujarat
Cost INR 1760 million
Financed By Government of India
Status 2013-2014
Description

Sarva Shiksha Abhiyan (SSA) is Government of India's flagship programme for achievement of Universalization of Elementary Education (UEE) in a time bound manner, as mandated by 86th amendment to the Constitution of India making free and compulsory Education to the Children of 6-14 years age group, a Fundamental Right.
SSA is being implemented in partnership with State Governments to cover the entire country and address the needs of 192 million children in 1.1 million habitations.
The programme seeks to open new schools in those habitations which do not have schooling facilities and strengthen existing school infrastructure through provision of additional class rooms, toilets, drinking water, maintenance grant and school improvement grants.

Supervised the construction work during the work under progress frequently to achieve the stipulated standards of quality in the project. If there is any discrepancy/ error / omission, point out the same with suggestions and
remedial measures within codal provision.

Carry out independent testing (Field & Laboratory) of construction materials and will report their findings with suggestions and remedial measures if any.

Evaluation of Civil Works under the Sarva Shiksha Abhiyan Programme (SSA) in the District Sabarkantha &Gandhinagar,Gujarat
Client Sarva Shiksha Abhiyan Gujarat
Cost INR 3285 million
Financed By Government of India
Status 2013-2014
Description

Sarva Shiksha Abhiyan (SSA) is Government of India's flagship programme for achievement of Universalization of Elementary Education (UEE) in a time bound manner, as mandated by 86th amendment to the Constitution of India making free and compulsory Education to the Children of 6-14 years age group, a Fundamental Right.
SSA is being implemented in partnership with State Governments to cover the entire country and address the needs of 192 million children in 1.1 million habitations.
The programme seeks to open new schools in those habitations which do not have schooling facilities and strengthen existing school infrastructure through provision of additional class rooms, toilets, drinking water, maintenance grant and school improvement grants.

Supervised the construction work during the work under progress frequently to achieve the stipulated standards of quality in the project. If there is any discrepancy/ error / omission, point out the same with suggestions and
remedial measures within codal provision.

Carry out independent testing (Field & Laboratory) of construction materials and will report their findings with suggestions and remedial measures if any.

Evaluation of Civil Works under the Sarva Shiksha Abhiyan Programme (SSA) in the District Patan And Surendranagar, Gujarat
Client Sarva Shiksha Abhiyan Gujarat
Cost INR 3285 million
Financed By Government of India
Status 2013-2014
Description

Sarva Shiksha Abhiyan (SSA) is Government of India's flagship programme for achievement of Universalization of Elementary Education (UEE) in a time bound manner, as mandated by 86th amendment to the Constitution of India making free and compulsory Education to the Children of 6-14 years age group, a Fundamental Right.
SSA is being implemented in partnership with State Governments to cover the entire country and address the needs of 192 million children in 1.1 million habitations.
The programme seeks to open new schools in those habitations which do not have schooling facilities and strengthen existing school infrastructure through provision of additional class rooms, toilets, drinking water, maintenance grant and school improvement grants.

Supervised the construction work during the work under progress frequently to achieve the stipulated standards of quality in the project. If there is any discrepancy/ error / omission, point out the same with suggestions and
remedial measures within codal provision.

Carry out independent testing (Field & Laboratory) of construction materials and will report their findings with suggestions and remedial measures if any.

Evaluation of Civil Works under the Sarva Shiksha Abhiyan Programme (SSA) in the District Anand, Gujarat
Client Sarva Shiksha Abhiyan Gujarat
Cost INR 4289 million
Financed By Government of India
Status 2013-2014
Description

Sarva Shiksha Abhiyan (SSA) is Government of India's flagship programme for achievement of Universalization of Elementary Education (UEE) in a time bound manner, as mandated by 86th amendment to the Constitution of India making free and compulsory Education to the Children of 6-14 years age group, a Fundamental Right.
SSA is being implemented in partnership with State Governments to cover the entire country and address the needs of 192 million children in 1.1 million habitations.
The programme seeks to open new schools in those habitations which do not have schooling facilities and strengthen existing school infrastructure through provision of additional class rooms, toilets, drinking water, maintenance grant and school improvement grants.

Supervised the construction work during the work under progress frequently to achieve the stipulated standards of quality in the project. If there is any discrepancy/ error / omission, point out the same with suggestions and
remedial measures within codal provision.

Carry out independent testing (Field & Laboratory) of construction materials and will report their findings with suggestions and remedial measures if any.

Evaluation of Civil Works under the Sarva Shiksha Abhiyan Programme (SSA) in the District Banaskantha, Gujarat
Client Sarva Shiksha Abhiyan Gujarat
Cost INR 1033 million
Financed By Government of India
Status 2012-2013
Description

Sarva Shiksha Abhiyan (SSA) is Government of India's flagship programme for achievement of Universalization of Elementary Education (UEE) in a time bound manner, as mandated by 86th amendment to the Constitution of India making free and compulsory Education to the Children of 6-14 years age group, a Fundamental Right.
SSA is being implemented in partnership with State Governments to cover the entire country and address the needs of 192 million children in 1.1 million habitations.
The programme seeks to open new schools in those habitations which do not have schooling facilities and strengthen existing school infrastructure through provision of additional class rooms, toilets, drinking water, maintenance grant and school improvement grants.

Supervised the construction work during the work under progress frequently to achieve the stipulated standards of quality in the project. If there is any discrepancy/ error / omission, point out the same with suggestions and
remedial measures within codal provision.

Carry out independent testing (Field & Laboratory) of construction materials and will report their findings with suggestions and remedial measures if any.

Evaluation of Civil Works under the Sarva Shiksha Abhiyan Programme (SSA) in the District Gandhinagar, Gujarat
Client Sarva Shiksha Abhiyan Gujarat
Cost INR 274 million
Financed By Government of India
Status 2012-2013
Description

Sarva Shiksha Abhiyan (SSA) is Government of India's flagship programme for achievement of Universalization of Elementary Education (UEE) in a time bound manner, as mandated by 86th amendment to the Constitution of India making free and compulsory Education to the Children of 6-14 years age group, a Fundamental Right.
SSA is being implemented in partnership with State Governments to cover the entire country and address the needs of 192 million children in 1.1 million habitations.
The programme seeks to open new schools in those habitations which do not have schooling facilities and strengthen existing school infrastructure through provision of additional class rooms, toilets, drinking water, maintenance grant and school improvement grants.

Supervised the construction work during the work under progress frequently to achieve the stipulated standards of quality in the project. If there is any discrepancy/ error / omission, point out the same with suggestions and
remedial measures within codal provision.

Carry out independent testing (Field & Laboratory) of construction materials and will report their findings with suggestions and remedial measures if any.

Evaluation of Civil Works under the Sarva Shiksha Abhiyan Programme (SSA) in the State Arunachal Pradesh
Client Educational Consultants India Limited, Noida
Cost INR 1000million
Financed By Government of India
Status 2009-11
Description

Sarva Shiksha Abhiyan (SSA) is Government of India's flagship programme for achievement of Universalization of Elementary Education (UEE) in a time bound manner, as mandated by 86th amendment to the Constitution of India making free and compulsory Education to the Children of 6-14 years age group, a Fundamental Right.
SSA is being implemented in partnership with State Governments to cover the entire country and address the needs of 192 million children in 1.1 million habitations.
The programme seeks to open new schools in those habitations which do not have schooling facilities and strengthen existing school infrastructure through provision of additional class rooms, toilets, drinking water, maintenance grant and school improvement grants.

Supervised the construction work during the work under progress frequently to achieve the stipulated standards of quality in the project. If there is any discrepancy/ error / omission, point out the same with suggestions and
remedial measures within codal provision.

Carry out independent testing (Field & Laboratory) of construction materials and will report their findings with suggestions and remedial measures if any.

Evaluation of Civil Works under the Sarva Shiksha Abhiyan Programme (SSA) in the State Himachal Pradesh
Client Educational Consultants India Limited, Noida
Cost INR 1500million
Financed By Government of India
Status 2009-11
Description

Sarva Shiksha Abhiyan (SSA) is Government of India's flagship programme for achievement of Universalization of Elementary Education (UEE) in a time bound manner, as mandated by 86th amendment to the Constitution of India making free and compulsory Education to the Children of 6-14 years age group, a Fundamental Right.
SSA is being implemented in partnership with State Governments to cover the entire country and address the needs of 192 million children in 1.1 million habitations.
The programme seeks to open new schools in those habitations which do not have schooling facilities and strengthen existing school infrastructure through provision of additional class rooms, toilets, drinking water, maintenance grant and school improvement grants.

Supervised the construction work during the work under progress frequently to achieve the stipulated standards of quality in the project. If there is any discrepancy/ error / omission, point out the same with suggestions and
remedial measures within codal provision.

Carry out independent testing (Field & Laboratory) of construction materials and will report their findings with suggestions and remedial measures if any.

Evaluation of Civil Works under the Sarva Shiksha Abhiyan Programme (SSA) in the State Jharkhand
Client Educational Consultants India Limited, Noida
Cost INR 3000million
Financed By Government of India
Status 2009-11
Description

Sarva Shiksha Abhiyan (SSA) is Government of India's flagship programme for achievement of Universalization of Elementary Education (UEE) in a time bound manner, as mandated by 86th amendment to the Constitution of India making free and compulsory Education to the Children of 6-14 years age group, a Fundamental Right.
SSA is being implemented in partnership with State Governments to cover the entire country and address the needs of 192 million children in 1.1 million habitations.
The programme seeks to open new schools in those habitations which do not have schooling facilities and strengthen existing school infrastructure through provision of additional class rooms, toilets, drinking water, maintenance grant and school improvement grants.

Supervised the construction work during the work under progress frequently to achieve the stipulated standards of quality in the project. If there is any discrepancy/ error / omission, point out the same with suggestions and
remedial measures within codal provision.

Carry out independent testing (Field & Laboratory) of construction materials and will report their findings with suggestions and remedial measures if any.

Evaluation of Civil Works under the Sarva Shiksha Abhiyan Programme (SSA) in the State Meghalaya
Client Educational Consultants India Limited, Noida
Cost INR 1500million
Financed By Government of India
Status 2009-11
Description

Sarva Shiksha Abhiyan (SSA) is Government of India's flagship programme for achievement of Universalization of Elementary Education (UEE) in a time bound manner, as mandated by 86th amendment to the Constitution of India making free and compulsory Education to the Children of 6-14 years age group, a Fundamental Right.
SSA is being implemented in partnership with State Governments to cover the entire country and address the needs of 192 million children in 1.1 million habitations.
The programme seeks to open new schools in those habitations which do not have schooling facilities and strengthen existing school infrastructure through provision of additional class rooms, toilets, drinking water, maintenance grant and school improvement grants.

Supervised the construction work during the work under progress frequently to achieve the stipulated standards of quality in the project. If there is any discrepancy/ error / omission, point out the same with suggestions and
remedial measures within codal provision.

Carry out independent testing (Field & Laboratory) of construction materials and will report their findings with suggestions and remedial measures if any.

Evaluation of Civil Works under the Sarva Shiksha Abhiyan Programme (SSA) in the State Orissa
Client Educational Consultants India Limited, Noida
Cost INR 6000million
Financed By Government of India
Status 2009-11
Description

Sarva Shiksha Abhiyan (SSA) is Government of India's flagship programme for achievement of Universalization of Elementary Education (UEE) in a time bound manner, as mandated by 86th amendment to the Constitution of India making free and compulsory Education to the Children of 6-14 years age group, a Fundamental Right.
SSA is being implemented in partnership with State Governments to cover the entire country and address the needs of 192 million children in 1.1 million habitations.
The programme seeks to open new schools in those habitations which do not have schooling facilities and strengthen existing school infrastructure through provision of additional class rooms, toilets, drinking water, maintenance grant and school improvement grants.

Supervised the construction work during the work under progress frequently to achieve the stipulated standards of quality in the project. If there is any discrepancy/ error / omission, point out the same with suggestions and
remedial measures within codal provision.

Carry out independent testing (Field & Laboratory) of construction materials and will report their findings with suggestions and remedial measures if any.

Evaluation of Civil Works under the Sarva Shiksha Abhiyan Programme (SSA) in the State Punjab.
Client Educational Consultants India Limited, Noida
Cost INR 5000million
Financed By Government of India
Status 2009-11
Description

Sarva Shiksha Abhiyan (SSA) is Government of India's flagship programme for achievement of Universalization of Elementary Education (UEE) in a time bound manner, as mandated by 86th amendment to the Constitution of India making free and compulsory Education to the Children of 6-14 years age group, a Fundamental Right.
SSA is being implemented in partnership with State Governments to cover the entire country and address the needs of 192 million children in 1.1 million habitations.
The programme seeks to open new schools in those habitations which do not have schooling facilities and strengthen existing school infrastructure through provision of additional class rooms, toilets, drinking water, maintenance grant and school improvement grants.

Supervised the construction work during the work under progress frequently to achieve the stipulated standards of quality in the project. If there is any discrepancy/ error / omission, point out the same with suggestions and
remedial measures within codal provision.

Carry out independent testing (Field & Laboratory) of construction materials and will report their findings with suggestions and remedial measures if any.

Evaluation of Civil Works under the Sarva Shiksha Abhiyan Programme (SSA) in the State Rajasthan
Client Educational Consultants India Limited, Noida
Cost INR 7500million
Financed By Government of India
Status 2009-11
Description

Sarva Shiksha Abhiyan (SSA) is Government of India's flagship programme for achievement of Universalization of Elementary Education (UEE) in a time bound manner, as mandated by 86th amendment to the Constitution of India making free and compulsory Education to the Children of 6-14 years age group, a Fundamental Right.
SSA is being implemented in partnership with State Governments to cover the entire country and address the needs of 192 million children in 1.1 million habitations.
The programme seeks to open new schools in those habitations which do not have schooling facilities and strengthen existing school infrastructure through provision of additional class rooms, toilets, drinking water, maintenance grant and school improvement grants.

Supervised the construction work during the work under progress frequently to achieve the stipulated standards of quality in the project. If there is any discrepancy/ error / omission, point out the same with suggestions and
remedial measures within codal provision.

Carry out independent testing (Field & Laboratory) of construction materials and will report their findings with suggestions and remedial measures if any.

Evaluation of Civil Works under the Sarva Shiksha Abhiyan Programme (SSA) in the State Uttrakhand
Client Educational Consultants India Limited, Noida
Cost INR 1500million
Financed By Government of India
Status 2009-11
Description

Sarva Shiksha Abhiyan (SSA) is Government of India's flagship programme for achievement of Universalization of Elementary Education (UEE) in a time bound manner, as mandated by 86th amendment to the Constitution of India making free and compulsory Education to the Children of 6-14 years age group, a Fundamental Right.
SSA is being implemented in partnership with State Governments to cover the entire country and address the needs of 192 million children in 1.1 million habitations.
The programme seeks to open new schools in those habitations which do not have schooling facilities and strengthen existing school infrastructure through provision of additional class rooms, toilets, drinking water, maintenance grant and school improvement grants.

Supervised the construction work during the work under progress frequently to achieve the stipulated standards of quality in the project. If there is any discrepancy/ error / omission, point out the same with suggestions and
remedial measures within codal provision.

Carry out independent testing (Field & Laboratory) of construction materials and will report their findings with suggestions and remedial measures if any.

Evaluation of Civil Works under the Sarva Shiksha Abhiyan Programme (SSA) in the State Andhra Pradesh(AP)
Client Educational Consultants India Limited, Noida
Cost INR 10,000million
Financed By Government of India
Status 2006-ongoing
Description

Sarva Shiksha Abhiyan (SSA) is Government of India's flagship programme for achievement of Universalization of Elementary Education (UEE) in a time bound manner, as mandated by 86th amendment to the Constitution of India making free and compulsory Education to the Children of 6-14 years age group, a Fundamental Right.
SSA is being implemented in partnership with State Governments to cover the entire country and address the needs of 192 million children in 1.1 million habitations.
The programme seeks to open new schools in those habitations which do not have schooling facilities and strengthen existing school infrastructure through provision of additional class rooms, toilets, drinking water, maintenance grant and school improvement grants.

Supervised the construction work during the work under progress frequently to achieve the stipulated standards of quality in the project. If there is any discrepancy/ error / omission, point out the same with suggestions and
remedial measures within codal provision.

Carry out independent testing (Field & Laboratory) of construction materials and will report their findings with suggestions and remedial measures if any.

Evaluation of Civil Works under the Sarva Shiksha Abhiyan Programme (SSA) in the State Assam
Client Educational Consultants India Limited, Noida
Cost INR 3000million
Financed By Government of India
Status 2006-ongoing
Description

Sarva Shiksha Abhiyan (SSA) is Government of India's flagship programme for achievement of Universalization of Elementary Education (UEE) in a time bound manner, as mandated by 86th amendment to the Constitution of India making free and compulsory Education to the Children of 6-14 years age group, a Fundamental Right.
SSA is being implemented in partnership with State Governments to cover the entire country and address the needs of 192 million children in 1.1 million habitations.
The programme seeks to open new schools in those habitations which do not have schooling facilities and strengthen existing school infrastructure through provision of additional class rooms, toilets, drinking water, maintenance grant and school improvement grants.

Supervised the construction work during the work under progress frequently to achieve the stipulated standards of quality in the project. If there is any discrepancy/ error / omission, point out the same with suggestions and
remedial measures within codal provision.

Carry out independent testing (Field & Laboratory) of construction materials and will report their findings with suggestions and remedial measures if any.

Evaluation of Civil Works under the Sarva Shiksha Abhiyan Programme (SSA) in the State Bihar
Client Educational Consultants India Limited, Noida
Cost INR 7000million
Financed By Government of India
Status 2006-ongoing
Description

Sarva Shiksha Abhiyan (SSA) is Government of India's flagship programme for achievement of Universalization of Elementary Education (UEE) in a time bound manner, as mandated by 86th amendment to the Constitution of India making free and compulsory Education to the Children of 6-14 years age group, a Fundamental Right.
SSA is being implemented in partnership with State Governments to cover the entire country and address the needs of 192 million children in 1.1 million habitations.
The programme seeks to open new schools in those habitations which do not have schooling facilities and strengthen existing school infrastructure through provision of additional class rooms, toilets, drinking water, maintenance grant and school improvement grants.

Supervised the construction work during the work under progress frequently to achieve the stipulated standards of quality in the project. If there is any discrepancy/ error / omission, point out the same with suggestions and
remedial measures within codal provision.

Carry out independent testing (Field & Laboratory) of construction materials and will report their findings with suggestions and remedial measures if any.

Evaluation of Civil Works under the Sarva Shiksha Abhiyan Programme (SSA) in the State Chhattisgarh
Client Educational Consultants India Limited, Noida
Cost INR 5000million
Financed By Government of India
Status 2006-ongoing
Description

Sarva Shiksha Abhiyan (SSA) is Government of India's flagship programme for achievement of Universalization of Elementary Education (UEE) in a time bound manner, as mandated by 86th amendment to the Constitution of India making free and compulsory Education to the Children of 6-14 years age group, a Fundamental Right.
SSA is being implemented in partnership with State Governments to cover the entire country and address the needs of 192 million children in 1.1 million habitations.
The programme seeks to open new schools in those habitations which do not have schooling facilities and strengthen existing school infrastructure through provision of additional class rooms, toilets, drinking water, maintenance grant and school improvement grants.

Supervised the construction work during the work under progress frequently to achieve the stipulated standards of quality in the project. If there is any discrepancy/ error / omission, point out the same with suggestions and
remedial measures within codal provision.

Carry out independent testing (Field & Laboratory) of construction materials and will report their findings with suggestions and remedial measures if any.

Evaluation of Civil Works under the Sarva Shiksha Abhiyan Programme (SSA) in the State Gujarat
Client Educational Consultants India Limited, Noida
Cost INR 11000million
Financed By Government of India
Status 2006-09
Description

Sarva Shiksha Abhiyan (SSA) is Government of India's flagship programme for achievement of Universalization of Elementary Education (UEE) in a time bound manner, as mandated by 86th amendment to the Constitution of India making free and compulsory Education to the Children of 6-14 years age group, a Fundamental Right.
SSA is being implemented in partnership with State Governments to cover the entire country and address the needs of 192 million children in 1.1 million habitations.
The programme seeks to open new schools in those habitations which do not have schooling facilities and strengthen existing school infrastructure through provision of additional class rooms, toilets, drinking water, maintenance grant and school improvement grants.

Supervised the construction work during the work under progress frequently to achieve the stipulated standards of quality in the project. If there is any discrepancy/ error / omission, point out the same with suggestions and
remedial measures within codal provision.

Carry out independent testing (Field & Laboratory) of construction materials and will report their findings with suggestions and remedial measures if any.

Evaluation of Civil Works under the Sarva Shiksha Abhiyan Programme (SSA) in the State jammu & Kashmir
Client Educational Consultants India Limited, Noida
Cost INR 3000million
Financed By Government of India
Status 2006-08
Description

Sarva Shiksha Abhiyan (SSA) is Government of India's flagship programme for achievement of Universalization of Elementary Education (UEE) in a time bound manner, as mandated by 86th amendment to the Constitution of India making free and compulsory Education to the Children of 6-14 years age group, a Fundamental Right.
SSA is being implemented in partnership with State Governments to cover the entire country and address the needs of 192 million children in 1.1 million habitations.
The programme seeks to open new schools in those habitations which do not have schooling facilities and strengthen existing school infrastructure through provision of additional class rooms, toilets, drinking water, maintenance grant and school improvement grants.

Supervised the construction work during the work under progress frequently to achieve the stipulated standards of quality in the project. If there is any discrepancy/ error / omission, point out the same with suggestions and
remedial measures within codal provision.

Carry out independent testing (Field & Laboratory) of construction materials and will report their findings with suggestions and remedial measures if any.

Evaluation of Civil Works under the Sarva Shiksha Abhiyan Programme (SSA) in the State Maharashtra (Mumbai).
Client Educational Consultants India Limited, Noida
Cost INR 12500million
Financed By Government of India
Status 2006-08
Description

Sarva Shiksha Abhiyan (SSA) is Government of India's flagship programme for achievement of Universalization of Elementary Education (UEE) in a time bound manner, as mandated by 86th amendment to the Constitution of India making free and compulsory Education to the Children of 6-14 years age group, a Fundamental Right.
SSA is being implemented in partnership with State Governments to cover the entire country and address the needs of 192 million children in 1.1 million habitations.
The programme seeks to open new schools in those habitations which do not have schooling facilities and strengthen existing school infrastructure through provision of additional class rooms, toilets, drinking water, maintenance grant and school improvement grants.

Supervised the construction work during the work under progress frequently to achieve the stipulated standards of quality in the project. If there is any discrepancy/ error / omission, point out the same with suggestions and
remedial measures within codal provision.

Carry out independent testing (Field & Laboratory) of construction materials and will report their findings with suggestions and remedial measures if any.

Evaluation of Civil Works under the Sarva Shiksha Abhiyan Programme (SSA) in the State West Bengal
Client Educational Consultants India Limited, Noida
Cost INR 8000million
Financed By Government of India
Status 2006-08
Description

Sarva Shiksha Abhiyan (SSA) is Government of India's flagship programme for achievement of Universalization of Elementary Education (UEE) in a time bound manner, as mandated by 86th amendment to the Constitution of India making free and compulsory Education to the Children of 6-14 years age group, a Fundamental Right.
SSA is being implemented in partnership with State Governments to cover the entire country and address the needs of 192 million children in 1.1 million habitations.
The programme seeks to open new schools in those habitations which do not have schooling facilities and strengthen existing school infrastructure through provision of additional class rooms, toilets, drinking water, maintenance grant and school improvement grants.

Supervised the construction work during the work under progress frequently to achieve the stipulated standards of quality in the project. If there is any discrepancy/ error / omission, point out the same with suggestions and
remedial measures within codal provision.

Carry out independent testing (Field & Laboratory) of construction materials and will report their findings with suggestions and remedial measures if any.

Evaluation of Civil Works under the Sarva Shiksha Abhiyan Programme (SSA) in the State Tamil Nadu
Client Educational Consultants India Limited, Noida
Cost INR 7800million
Financed By Government of India
Status 2006-08
Description

Sarva Shiksha Abhiyan (SSA) is Government of India's flagship programme for achievement of Universalization of Elementary Education (UEE) in a time bound manner, as mandated by 86th amendment to the Constitution of India making free and compulsory Education to the Children of 6-14 years age group, a Fundamental Right.
SSA is being implemented in partnership with State Governments to cover the entire country and address the needs of 192 million children in 1.1 million habitations.
The programme seeks to open new schools in those habitations which do not have schooling facilities and strengthen existing school infrastructure through provision of additional class rooms, toilets, drinking water, maintenance grant and school improvement grants.

Supervised the construction work during the work under progress frequently to achieve the stipulated standards of quality in the project. If there is any discrepancy/ error / omission, point out the same with suggestions and
remedial measures within codal provision.

Carry out independent testing (Field & Laboratory) of construction materials and will report their findings with suggestions and remedial measures if any.

Evaluation of Civil Works under the Sarva Shiksha Abhiyan Programme (SSA) in the State Uttar Pradesh (UP).
Client Educational Consultants India Limited, Noida
Cost INR 12500million
Financed By Government of India
Status 2006-08
Description

Sarva Shiksha Abhiyan (SSA) is Government of India's flagship programme for achievement of Universalization of Elementary Education (UEE) in a time bound manner, as mandated by 86th amendment to the Constitution of India making free and compulsory Education to the Children of 6-14 years age group, a Fundamental Right.
SSA is being implemented in partnership with State Governments to cover the entire country and address the needs of 192 million children in 1.1 million habitations.
The programme seeks to open new schools in those habitations which do not have schooling facilities and strengthen existing school infrastructure through provision of additional class rooms, toilets, drinking water, maintenance grant and school improvement grants.

Supervised the construction work during the work under progress frequently to achieve the stipulated standards of quality in the project. If there is any discrepancy/ error / omission, point out the same with suggestions and
remedial measures within codal provision.

Carry out independent testing (Field & Laboratory) of construction materials and will report their findings with suggestions and remedial measures if any.

Quick Query
Latest News

1. Technical and Vocational Training under Sarva Shiksha Abhiyan Project.

2. PMC for Water Supply of Greater Banjul, the Gambia.

3. Project Management Consultancy services for the design and construction supervision of 1200 housing units in the provinces of Mozambique- 400 in TETE, Mozambique

4. Consultancy Services to carry out complete Design for the Kule & Tierkidi Refugee camps piped Water Supply Project, Ethiopia.

5. Consultancy Services for Augmentation and Reorganization of Mango Urban Water Supply Scheme.

6. Project Management consultants Himachal Pradesh Crop Diversification Promotion Project (JICAODA) Loan Hamirpur (H.P.)

7. Evaluation of Civil Works under the Sarva Shiksha Abhiyan Programme (SSA) in the District Dahod Gujarat

8. Third Party Quality Control and Quality Assurance of Construction Works for Implementation of Surface Water Minor Irrigation Structures under WBADMIP

9. Storm Water Scheme for new area of Ladwa, Kurukshetra.

10. Sewerage Scheme in newly approved colonies in Kurukshetra Town Dist. Kurukshetra.

11. Providing Sewerage Scheme in new areas of Ladwa Town Dist. Kurukshetra.

12. Sewerage Scheme for the Rajaund Town, Kaithal.

13. Water Supply scheme for Rajound Town, Kaithal

14. 3rd Party Quality Control Services for Civil Works of Greater Hyderabad Municipal Corporation.

15. Third Party Quality Control Consultancy Services in SVS and MVS of TSRWSSP works of Adilabad

16. Third Party Quality Control Consultancy Services in SVS and MVS of TSRWSSP works of Karimnagar.

17. Third Party Technical Supervisor, Monitoring and Quality Assurance of Civil works of Tribal Welfare Engineering Division (I.T.D.A.) Utnoor of Adilabad District.

18. Third Party Quality Control Ongole Municipal Corporation- Engineering section Civil, Electrical, Mechanical and Supply Material.

19. (Third Party Quality Control) Engineering Section- Paddapuram Municipality- Execution of Civil Works.

20. Storm Water Detailed Project report of Paddapuram.